Summary
Archirodon Group is hiring a Senior Mechanical Pipeline Quantity Surveyor in Abu Dhabi. The role covers quantity and cost control, project risk reporting, contractor claims, material reconciliation, and coordination with engineering, procurement, construction, and contracts teams. Duties also include checking MTOs against AFC drawings and supporting pipeline tie-ins, shutdown activities, site variations, and work packaging. Applicants need a bachelor’s degree in Mechanical Engineering and 5–10 years of experience, including work on oil and gas projects; ADNOC project experience is an advantage.
The posting
As published on archirodon.net. Pulled from the employer's site and shown as they wrote it.
Company Description
Archirodon, having earned its reputation as a reliable and respected international contractor for more than a half century in the Engineering, Procurement and Construction (EPC) market, continues to create value to its stakeholders by executing complex EPC projects worldwide, in recognition of its superior standards of performance.
We have an outstanding record in completing major Energy, Marine, Infrastructure and Defense & Security projects around the globe and we pride ourselves on delivering over the years the kind of reliability and trust that the client has the right to expect from a major EPC contractor.
Job Description
Senior Pipeline QS with expertise in pipeline activities, collaborating closely with Field Engineering, Procurement, Cost Control, Construction, and Contracts teams to manage quantity and cost control workflows.
Skilled in identifying project risks based on contract documents, schedules, and deliverables, ensuring minimal cost and schedule impacts.
Proficient in submitting fortnightly risk reports and mitigation plans aligned with EPC/Contractor performance.
Experienced in developing strategic plans and advising management on cost-controlled solutions for claims raised by contractors, while cross-checking MTOs with AFC drawings to update procurement needs.
Strong knowledge of project design methods, construction monitoring, and lifecycle planning from quantity and material scheduling to coordinating with multidisciplinary teams (piping, mechanical, civil, E&I).
Hands-on experience with tie-ins, pre-shutdown, and shutdown activities, including material requisition packages.
Adept in field change approvals (FCN, DCN), site variations, test pack verifications, and as-built requirements.
Well-versed in Installation Work Packages (IWP) and Workface Planning (WFP) to implement Advanced Work Package (AWP) methodology, ensuring milestone-based execution.
Proficiency in MS excel for controlling the Materials
Ability to reconcile the materials released to sub-contractor.
Proficiency on AutoCAD for reading Alignment sheets drawings and basilar knowledge of related pipeline design
Qualifications
- Bachelor Degree in Mechanical Engineering
- Minimum 5-10 years' experience
- With experience working in Oil & Gas Projects
- Advantage if with experience working in EPC company in ADNOC Projects.